The purpose of the Fire Hydrant Meter Permit Program is
to help the City track the amount of water used during construction. Prior
to construction, contractors must obtain a hydrant meter permit. All fees
and deposits under the fire hydrant permit shall be paid prior to permit
issuance.
The following are some frequently asked questions:
Q Is there anything else needed besides a hydrant meter for construction
purposes?
A Yes, a backflow device is always needed whenever water is being
used/metered from a fire hydrant. You can use your own backflow device,
rent the city’s, or use a City of West Sacramento permitted water
truck.
Q How much does it cost to permit a water truck?
A $50.00, and it is valid for two years.
Q If my truck has a 2-inch air gap, do I still need a backflow device?
A No.
Q Will I be required to pay a deposit if I’m working on a City project?
A Yes. However, you will only be required to pay a refundable deposit.
All rental and water use fees will be charged to the project, as long as
you can provide a valid work order number which is issued by the engineering
division.
• Fire Hydrant
Permit Conditions
• Estimate your Fire Hydrant Meter Permit fee
Please contact us at (916) 617-4850 to confirm your estimated costs.
|